Back to all project case studies
Nokia AirScale Radio Rollout
STL25PDF p. 9, p. 12, p. 23Saint-Louis (Site STL25) — New Nokia AirScale Site Installation & Integration
Rack installation, Nokia-standard cabling and software integration for Orange's new STL25 site in Saint-Louis.
LocationSaint-Louis, Saint-Louis Region
Client / OperatorOrange Sénégal
Coordinates / Scope15.999127° N, -16.48942° W
Source DocumentEasy Telecom Company Profile (PDF p. 9, p. 12, p. 23)
01 // CLIENT REQUIREMENT
Operational Objective on Site
Commission a new Orange Sénégal radio site in Saint-Louis (STL25) with strict cabling and labeling quality tailored for coastal conditions.
02 // DOCUMENTED ENGINEERING WORKS
Field Works Executed by Easy Telecom
- Rack mounting of Nokia AirScale subracks and RF modules
- Routing, termination and individual labeling of every CPRI fiber and coaxial jumper to Nokia standards
- Part of the Saint-Louis & Matam program: 10 site installations, 2 new sites, 18 antenna swaps with extension and 6 FSMF repositionings
03 // DELIVERABLES & REGIONAL ROLLOUT CONTEXT
Site Handover & Context
- New site STL25 integrated and documented (NoteCam records dated November 25, 2020)
- Cabling fully compliant with Nokia / Orange Sénégal quality audits
Anchor reference for the Northern hub (Saint-Louis & Matam), where Easy Telecom delivered 18 antenna swaps, 10 site installations and 13 logistics operations (Saint-Louis & Louga).
Worksite Photography (3)



Planning a similar telecom site intervention?
Contact our engineering team in Dakar to schedule a site survey, turnkey build or radio swap.
Discuss your projectOther Documented Case Studies
View all 8 projects →Touba, Diourbel Region • TOUBA AL AZHAR03
Read case studyTouba (Al Azhar 03) — New Site Installation & Nokia AirScale Integration
Mbour, Thiès Region (Petite-Côte) • MBOUR 06
Read case studyMbour (Site MBOUR 06) — Nokia Installation, Commissioning, Dismantling & Normalization
Cambérène, Dakar Region • CAMBERENE_BSC
Read case study