Cambérène (BSC Site) — Civil Works & Remodelling of a Core Free Sénégal Facility

Complete Before/After remodelling of the building envelope, steel closures and technical courtyard for Free Sénégal's Base Station Controller (BSC) in Cambérène.

LocationCambérène, Dakar Region
Client / OperatorFree Sénégal
Coordinates / Scope14.757354° N, -17.425157° W
Source DocumentEasy Telecom Company Profile (PDF p. 4, p. 8, p. 24)
01 // CLIENT REQUIREMENT

Operational Objective on Site

Rehabilitate the building structure, security gates and technical courtyard of the Cambérène BSC—a critical network node controlling multiple base stations—while keeping live telecom operations uninterrupted.

02 // DOCUMENTED ENGINEERING WORKS

Field Works Executed by Easy Telecom

  • Initial technical survey and geolocated baseline documentation (NoteCam: 14.7573° N, -17.4251° W)
  • Removal of corroded wire fencing and aging metal doors around the tower base
  • Masonry repairs, full exterior and interior wall resurfacing, protective coating and courtyard slab refurbishment
  • Supply and installation of new louvered steel gates, heavy-duty technical room doors and tower-base repainting
03 // DELIVERABLES & REGIONAL ROLLOUT CONTEXT

Site Handover & Context

  • Fully rehabilitated and secured Cambérène BSC compound for Free Sénégal
  • Timestamped Before / After completion dossier (November 2019 – January 2020)
  • Long-term protection of equipment rooms and tower foundations against coastal corrosion
A flagship reference for Easy Telecom's Civil Works division in Dakar, complementing full-turnkey site constructions delivered in Diass–AIBD, Thiès and Kaolack.

Worksite Photography (5)

After renovation: resurfaced exterior wall, ventilation louvers and new heavy-duty steel gate.After — Facade & Gate
After renovation: resurfaced exterior wall, ventilation louvers and new heavy-duty steel gate.
Before renovation: initial condition of the Cambérène BSC outer compound during the November 2019 survey.Before — Initial State
Before renovation: initial condition of the Cambérène BSC outer compound during the November 2019 survey.
After renovation: refurbished inner technical courtyard and new steel doors for the equipment rooms.After — Inner Courtyard
After renovation: refurbished inner technical courtyard and new steel doors for the equipment rooms.
Before renovation: weathered fencing and metal doors surrounding the tower base.Before — Inner Courtyard
Before renovation: weathered fencing and metal doors surrounding the tower base.
After renovation: repainted self-supporting tower base on concrete foundations with secured room access.After — Tower Base
After renovation: repainted self-supporting tower base on concrete foundations with secured room access.

Planning a similar telecom site intervention?

Contact our engineering team in Dakar to schedule a site survey, turnkey build or radio swap.

Discuss your project
Documented Field Comparison (PDF p. 24)

Cambérène BSC Facility — Before / After Renovation

Before renovation (Nov 12, 2019 — NoteCam)
Before renovation (Nov 12, 2019 — NoteCam)
After renovation (Jan 24, 2020 — NoteCam)
After renovation (Jan 24, 2020 — NoteCam)