Telecom Engineering & Field Works in Senegal — Since 2016
Back to all project case studies
Heavy Logistics, Rigging & Power
28 SITES -> EDH DAKARPDF p. 11, p. 13, p. 25

National Logistics Program (28 Sites) — Dismantling, Crane Lifting & Transport to EDH Free Sénégal

Dismantling, crane-truck lifting and long-haul transport to Dakar (EDH) of diesel generators, fuel tanks and solar panels across 28 regional sites.

LocationKolda, Kédougou, Tambacounda, Saint-Louis, Louga → Dakar
Client / OperatorFree Sénégal
Coordinates / ScopeKolda (9), Kédougou/Tamba (6), St-Louis/Louga (13) → Dakar EDH
Source DocumentEasy Telecom Company Profile (PDF p. 11, p. 13, p. 25)
01 // CLIENT REQUIREMENT

Operational Objective on Site

Safely decommission off-grid power assets (diesel generators, fuel tanks and solar arrays) across 28 sites spanning 5 regions of Senegal and repatriate every unit to Free Sénégal's central EDH warehouse in Dakar.

02 // DOCUMENTED ENGINEERING WORKS

Field Works Executed by Easy Telecom

  • 13 sites in the Saint-Louis and Louga area: generator and fuel tank dismantling and transport to EDH Free Sénégal
  • 9 sites in the Kolda area: generator and fuel tank dismantling and transport, including solar panel dismantling across 4 sites
  • 6 sites in the Kédougou and Tambacounda area: generator and fuel tank dismantling and transport, including solar panel dismantling at site TC_MAKO
  • Certified rigging operations (Apave), crane-truck handling and geolocated reception inventory at the Dakar EDH depot
03 // DELIVERABLES & REGIONAL ROLLOUT CONTEXT

Site Handover & Context

  • 28 regional sites safely dismantled and transported to Dakar (13 North + 9 South + 6 East)
  • 6 sites with complete solar panel array recovery (including TC_MAKO and 4 sites in Kolda)
Demonstrates Easy Telecom's nationwide logistics reach, mobilizing crane trucks, L200 pickups and certified riggers across the farthest corridors of Senegal.

Worksite Photography (4)

Heavy lifting operation with a Volvo Globetrotter crane truck at site LG 2532 Leona (Louga – Saint-Louis axis).
Heavy lifting operation with a Volvo Globetrotter crane truck at site LG 2532 Leona (Louga – Saint-Louis axis).
Flatbed truck loading of dismantled TecnoGen diesel generators and fuel tank.
Flatbed truck loading of dismantled TecnoGen diesel generators and fuel tank.
Protected stacking and delivery of dismantled solar panels (6 sites including TC_MAKO and 4 in Kolda) at the EDH warehouse.
Protected stacking and delivery of dismantled solar panels (6 sites including TC_MAKO and 4 in Kolda) at the EDH warehouse.
Structured storage of recovered diesel generators at the EDH Free Sénégal warehouse in Dakar.
Structured storage of recovered diesel generators at the EDH Free Sénégal warehouse in Dakar.

Planning a similar telecom site intervention?

Contact our engineering team in Dakar to schedule a site survey, turnkey build or radio swap.

Discuss your project