Back to all project case studies
Fiber ODF, Civil Works & Nokia Sites
KLK33 / KLK35PDF p. 12, p. 21Kaolack (Sites KLK33 / KLK35 & KLK19 / KLK24) — New Orange Sites & ODF Rollout
ODF survey and cabinet installation on Orange's new KLK33/KLK35 sites alongside Nokia site deployments on KLK19 and KLK24.
LocationKaolack, Kaolack Region
Client / OperatorOrange Sénégal
Coordinates / Scope14°9.328' N, -16°2.977' W
Source DocumentEasy Telecom Company Profile (PDF p. 12, p. 21)
01 // CLIENT REQUIREMENT
Operational Objective on Site
Support Orange Sénégal's optical and radio expansion in Kaolack through new site civil works (concrete slabs, monopoles, canopies) and ODF cabinet integration.
02 // DOCUMENTED ENGINEERING WORKS
Field Works Executed by Easy Telecom
- ODF technical survey and outdoor optical cabinet fixation on concrete slabs (sites KLK33 / KLK35)
- Complete installation of 2 Nokia sites (KLK19 and KLK24) in the Kaolack area
- Part of the Mbour–Touba–Kaolack cluster: 9 ODF cabinets installed, 7 microwave links aligned and 35 LTE 1800 extensions
03 // DELIVERABLES & REGIONAL ROLLOUT CONTEXT
Site Handover & Context
- Sites KLK33 / KLK35 equipped with ODF cabinets and supporting civil infrastructure
- Nokia sites KLK19 and KLK24 installed and commissioned
Kaolack serves as Easy Telecom's central operational hub connecting the Groundnut Basin, Eastern Senegal and Casamance.
Worksite Photography (3)



Planning a similar telecom site intervention?
Contact our engineering team in Dakar to schedule a site survey, turnkey build or radio swap.
Discuss your projectOther Documented Case Studies
View all 8 projects →Touba, Diourbel Region • TOUBA AL AZHAR03
Read case studyTouba (Al Azhar 03) — New Site Installation & Nokia AirScale Integration
Mbour, Thiès Region (Petite-Côte) • MBOUR 06
Read case studyMbour (Site MBOUR 06) — Nokia Installation, Commissioning, Dismantling & Normalization
Cambérène, Dakar Region • CAMBERENE_BSC
Read case study